AES Greenidge Bioethanol Co-Location Assessment: Final Report, 13 November 2001 -- 31 August 2002

Research output: NRELSubcontract Report

Abstract

This study evaluates the feasibility of co-locating a cellulose-to-ethanol (bioethanol) facility at the existing AES Greenidge coal-fired electric power plant near Dresden, NY.
Original languageAmerican English
Number of pages124
StatePublished - 2002

Bibliographical note

Work performed by Easterly Consulting, Fairfax, Virginia

NREL Publication Number

  • NREL/SR-510-33001

Keywords

  • bioethanol
  • co-location
  • coal fired power plants
  • corn stover

Fingerprint

Dive into the research topics of 'AES Greenidge Bioethanol Co-Location Assessment: Final Report, 13 November 2001 -- 31 August 2002'. Together they form a unique fingerprint.

Cite this