Abstract
In this paper, we analyze sub-hourly ramping requirements and the benefit of combining Balancing Authority operations with significant wind penetrations.
| Original language | American English |
|---|---|
| Number of pages | 19 |
| State | Published - 2008 |
| Event | WindPower 2008 - Houston, Texas Duration: 1 Jun 2008 → 4 Jun 2008 |
Conference
| Conference | WindPower 2008 |
|---|---|
| City | Houston, Texas |
| Period | 1/06/08 → 4/06/08 |
NREL Publication Number
- NREL/CP-500-43434
Keywords
- capacity value
- electric utilities
- integration
- ISO
- RTO
- wind
- wind integration