Abstract
A hybrid PV plant (HPP) combines a photovoltaic (PV) plant with a battery energy storage system (BESS), which is considered a promising step towards the future of renewable power plants by the U.S. Department of Energy. When the renewable penetration reaches a significant level, a hybrid PV plant can bid in as a controllable thermal plant in the future electricity market. In this study, a bidding and BESS scheduling model is proposed for the HPP. The robust optimization (RO) technique has been utilized to identify the worst-case scenario of uncertainties during the bidding process. To address the overly conservative issue of the single-stage RO, we have decoupled the BESS schedule for arbitrage and PV capacity firming by a two-stage RO formulation. By comparing the output of single-stage RO and two-stage RO, the two-stage RO bids and schedules in a more aggressive manner, which increases the income of HPP. Also, the penalty of under-generation is considered in our model so that the day-ahead bidding decision and arbitrage schedules can be adjusted based on the potential UNDER-GENERATION penalty. Because the proposed model is non-convex and contains multi-stages, the Column-and-Constraint Generation (C&CG) algorithm is applied to the model as the solution. The proposed model has shown better economic performance compared to a state-of-art single-stage bidding method in case studies.
Original language | American English |
---|---|
Number of pages | 5 |
DOIs | |
State | Published - 2022 |
Event | 2022 IEEE Power and Energy Society General Meeting, PESGM 2022 - Denver, United States Duration: 17 Jul 2022 → 21 Jul 2022 |
Conference
Conference | 2022 IEEE Power and Energy Society General Meeting, PESGM 2022 |
---|---|
Country/Territory | United States |
City | Denver |
Period | 17/07/22 → 21/07/22 |
Bibliographical note
See NREL/CP-5D00-82896 for preprintNREL Publication Number
- NREL/CP-5D00-84960
Keywords
- BESS scheduling
- bidding model
- C&CG algorithm
- Hybrid PV plant
- two-stage robust optimization