Best Practices for Plug Load Management Using a Building Energy Management System

Research output: NRELFact Sheet

Abstract

The University of California San Diego (UCSD) successfully integrated PLCs with their BEMS, which resulted in 66% energy savings over one week across 25 plug loads (K. Chia et al. 2023). UCSD documented each step of this effort, highlighting best practices along the way, in their 10-page brief, "Best Practices for Plug Load Management Using a Building Energy Management System" (also referred to as "brief" in this document). This fact sheet provides highlights and key takeaways from UCSD's brief. The reader is encouraged to read UCSD's full brief if they wish to move forward with implementing PLC integration with their BEMS.
Original languageAmerican English
PublisherNational Renewable Energy Laboratory (NREL)
Number of pages3
StatePublished - 2024

NREL Publication Number

  • NREL/FS-5500-91368

Keywords

  • Building Energy Management System Integration
  • plug load
  • plug load control

Fingerprint

Dive into the research topics of 'Best Practices for Plug Load Management Using a Building Energy Management System'. Together they form a unique fingerprint.

Cite this