Abstract
The National Renewable Energy Laboratory (NREL) was contracted by the Department of Defense (DOD) Environmental Security Technology Certification Program (ESTCP) and the Department of Energy (DOE) Federal Energy Management Program (FEMP) to develop a web tool and complete pilot assessments for the installation of Electric Vehicle Supply Equipment (EVSE). NREL has deployed Tiger Teams comprising engineers and fleet experts to support DOD and DOE on several EVSE site assessments since 2015. However, the advancements developed in support of this report, including a cost-estimation tool and geospatial mapping tool, will enable a user-driven path to assess EVSE needs. This report details the site design recommendations for Camp Lejeune, North Carolina.
Original language | American English |
---|---|
Number of pages | 67 |
DOIs | |
State | Published - 2022 |
NREL Publication Number
- NREL/TP-5400-83625
Keywords
- charging infrastructure
- cost assessment
- electric vehicle
- electric vehicle charging infrastrustrure
- electric vehicle supply equipment
- EV
- EVSE