Commissioning of the Fresno, California, Retrofit Unoccupied Test House

Dave Stecher, C. Imm

Research output: NRELSubcontract Report

Abstract

Commissioning of instrumentation and limited short-term testing have been completed on a retrofit unoccupied test house in Fresno, California. This house is intended to be used as a laboratory in which several different methods of space conditioning distribution will be evaluated. This report provides background on the project, including specifications of the house and models used in itsdevelopment, along with models to be evaluated through its operation.
Original languageAmerican English
PublisherNational Renewable Energy Laboratory (NREL)
Number of pages37
StatePublished - 2013

Bibliographical note

Work performed by IBACOS, Pittsburgh, Pennsylvania

NREL Publication Number

  • NREL/SR-5500-58668

Other Report Number

  • DOE/GO-102013-3938

Keywords

  • Building America
  • commissioning
  • Fresno
  • residential
  • residential buildings
  • retrofit

Fingerprint

Dive into the research topics of 'Commissioning of the Fresno, California, Retrofit Unoccupied Test House'. Together they form a unique fingerprint.

Cite this