Abstract
This measurement and verification (M and V) protocol provides procedures for energy service companies (ESCOs) and water efficiency service companies (WESCOs) to determine water savings resulting from water conservation measures (WCMs) in energy performance contracts associated with cooling tower efficiency projects. The water savings are determined by comparing the baseline water use to the water use after the WCM has been implemented. This protocol outlines the basic structure of the M and V plan, and details the procedures to use to determine water savings.
Original language | American English |
---|---|
Number of pages | 26 |
State | Published - 2017 |
Bibliographical note
Work performed by Pacific Northwest National Laboratory, Richland, Washington, and Colorado Energy Office, Denver, ColoradoNREL Publication Number
- NREL/SR-7A40-70219
Keywords
- cooling tower
- energy service companies
- measurement and verification protocol
- water conservation measures
- water efficiency
- water savings