Cooling Tower (Evaporative Cooling System) Measurement and Verification Protocol

Charles Kurnik, Brian Boyd, Kate Stoughton, Taylor Lewis, Charles Kurnik (NREL Technical Monitor)

Research output: NRELSubcontract Report

Abstract

This measurement and verification (M and V) protocol provides procedures for energy service companies (ESCOs) and water efficiency service companies (WESCOs) to determine water savings resulting from water conservation measures (WCMs) in energy performance contracts associated with cooling tower efficiency projects. The water savings are determined by comparing the baseline water use to the water use after the WCM has been implemented. This protocol outlines the basic structure of the M and V plan, and details the procedures to use to determine water savings.
Original languageAmerican English
Number of pages26
StatePublished - 2017

Bibliographical note

Work performed by Pacific Northwest National Laboratory, Richland, Washington, and Colorado Energy Office, Denver, Colorado

NREL Publication Number

  • NREL/SR-7A40-70219

Keywords

  • cooling tower
  • energy service companies
  • measurement and verification protocol
  • water conservation measures
  • water efficiency
  • water savings

Fingerprint

Dive into the research topics of 'Cooling Tower (Evaporative Cooling System) Measurement and Verification Protocol'. Together they form a unique fingerprint.

Cite this