Abstract
This report addresses the various aspects of setting up a CPV testbed and procedures for handling and testing CPV modules.
| Original language | American English |
|---|---|
| Number of pages | 29 |
| DOIs | |
| State | Published - 2009 |
NREL Publication Number
- NREL/TP-520-46569
Keywords
- concentrating photovoltaics (CPV)
- efficiency
- module
- outdoor testing facility
- power rating
- procedures
- PV
- testbed
- testing and evaluation
- tracking error
- two-axis tracking