Abstract
The project objective was to demonstrate the capabilities of the high-performance multi-staged IEC technology and its ability to enhance energy efficiency and interior comfort in dry climates, while substantially reducing electric-peak demand. The project was designed to test 24 cooling units in five commercial building types at Fort Carson Army Base in Colorado Springs, Colorado.
Original language | American English |
---|---|
DOIs | |
State | Published - 2012 |
Bibliographical note
Summary Report: http://www.nrel.gov/docs/fy13osti/56256-2.pdfNREL Publication Number
- NREL/TP-7A40-56256
Keywords
- Coolerado
- dew-point indirect evaporative cooler
- ESTCP
- NREL