Abstract
Northern Power Systems specializes in direct drive wind turbine designs. CRADA CRD-10-394 involved testing the NW2200 wind turbine power train. Power train testing is important because it allows validation of the generator design and some control algorithms prior to installation on a tower, where this data would be more difficult and time consuming to collect. In an effort to keep the commercialproduct schedule on time, Northern Power requested testing support from the National Renewable Energy Laboratory for this testing. The test program was performed using NREL's 2.5 MW dynamometer test bed at the National Wind Technology Center near Boulder, CO.
Original language | American English |
---|---|
Number of pages | 4 |
DOIs | |
State | Published - 2012 |
NREL Publication Number
- NREL/TP-7A10-53456
Keywords
- CRADA
- power train
- wind turbines