Electricity Supply Infrastructure Improvements: Final Technical Status Report, December 2010

NREL, Thomas Basso (NREL Technical Monitor)

Research output: NRELSubcontract Report

Abstract

This report is about a work effort where the overall objectives were to establish a methodology and approach for selected transmission and distribution (T&D) grid modernization; monitor the results; and report on the findings, recommendations, and lessons learned. The work reported addressed T&D problems and solutions, related reliability issues, equipment and operation upgrades, and respectivefield testing.
Original languageAmerican English
Number of pages91
StatePublished - 2011

Bibliographical note

Work performed by Northern Indiana Public Service Company, Merrillville, Indiana

NREL Publication Number

  • NREL/SR-5500-49793

Keywords

  • 345 kv transmission circuits
  • electrical transmission
  • electricity infrastructure
  • electricity supply infrastructure improvements