@misc{0e46791640304e85bf3742b0da75f560,
title = "Enhancing the EVI-X National Framework to Address Emerging Questions on Charging Infrastructure Deployment",
abstract = "As national investments in EV charging infrastructure accelerate, this project advances the state-of-the-art in infrastructure analysis to better inform deployment strategies. It enhances NLR's EVI-X Suite, a set of tools supporting national network planning, local site design, and financial evaluation. These capabilities will position VTO to provide timely analysis to the DOT/DOE Joint Office, and to guide the strategic buildout of the national charging network. EVI-X development is closely coordinated with other VTO-funded efforts to ensure consistent, integrated use of key inputs and outputs, including EV adoption scenarios from TEMPO and infrastructure designs developed through EVs@Scale.",
keywords = "charging infrastructure, electric vehicle, fast charging, levelized cost of charging, vehicle-grid integration",
author = "Brennan Borlaug and Vince Caristo and Yanbo Ge and Zhaocai Liu and Nick Reinicke and Eddie Rose and \{St. Louis-Sanchez\}, Maria and Eric Wood",
year = "2025",
doi = "10.2172/3015036",
language = "American English",
series = "Presented at the U.S. Department of Energy (DOE) Vehicle Technologies Office (VTO) 2025 Annual Merit Review, 2-5 June 2025, Arlington, Virginia",
type = "Other",
}