Evaluating the Curtailment Risk of Non-Firm Utility-Scale Solar Photovoltaic Plants Under a Novel Last-In First-Out Principle of Access Interconnection Agreement

Kwami Sedzro, Kelsey Horowitz, Akshay Jain, Fei Ding, Bryan Palmintier, Barry Mather

Research output: Contribution to journalArticlepeer-review

3 Scopus Citations

Abstract

AbstractsWith the increasing share of distributed energy resources on the electric grid, utility companies are facing significant decisions about infrastructure upgrades. An alternative to extensive and capital-intensive upgrades is to offer non-firm interconnection opportunities to distributed generators, via a coordinated operation of utility scale resources. This paper introduces a novel flexible interconnection option based on the last-in, first-out principles of access aimed at minimizing the unnecessary non-firm generation energy curtailment by balancing access rights and contribution to thermal overloads. Although we focus on solar photovoltaic (PV) plants in this work, the introduced flexible interconnection option applies to any distributed generation technology. The curtailment risk of individual non-firm PV units is evaluated across a range of PV penetration levels in a yearlong quasi-static time-series simulation on a real-world feeder. The results show the importance of the size of the curtailment zone in the curtailment risk distribution among flexible generation units as well as that of the “access right” defined by the order in which PV units connect to the grid. Case study results reveal that, with a proper selection of curtailment radius, utilities can reduce the total curtailment of flexible PV resources by up to more than 45%. Findings show that non-firm PV generators can effectively avoid all thermal limit-related upgrade costs.

Original languageAmerican English
Article number1463
Number of pages14
JournalEnergies
Volume14
Issue number5
DOIs
StatePublished - 2021

Bibliographical note

Publisher Copyright:
© 2021 by the authors. Licensee MDPI, Basel, Switzerland.

NREL Publication Number

  • NREL/JA-5D00-74776

Keywords

  • active network management
  • distributed PV integration
  • PV interconnection agreement
  • renewable integration

Fingerprint

Dive into the research topics of 'Evaluating the Curtailment Risk of Non-Firm Utility-Scale Solar Photovoltaic Plants Under a Novel Last-In First-Out Principle of Access Interconnection Agreement'. Together they form a unique fingerprint.

Cite this