Abstract
With support from the U.S. Department of Energy (DOE) Solar Energy Technologies Office (SETO), the National Renewable Energy Laboratory (NREL) partnered with Peak Reliability to evaluate the impact of the August 21, 2017 total solar eclipse on the reliability and grid operations in the Western Electricity Coordinating Council (WECC) territory.
Original language | American English |
---|---|
Number of pages | 48 |
DOIs | |
State | Published - 2018 |
NREL Publication Number
- NREL/TP-5D00-71147
Keywords
- 2017 solar eclipse
- eclipse
- electric grid
- impact
- peak reliability
- solar