Abstract
The following report provides a levelized cost of energy comparison between CSP and PV with batteries over the next 15 years, using historic progress ratios for the various technologies as well as industry analyst projections.
Original language | American English |
---|---|
Number of pages | 38 |
DOIs | |
State | Published - 2016 |
NREL Publication Number
- NREL/TP-6A20-66592
Keywords
- battery
- CSP
- experience curve
- LCOE
- learning curve
- levelized cost of energy
- progress ratio
- PV
- solar
- solar thermal
- storage