Abstract
The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Jeddo Tunnel discharge site for a feasibility study of renewable energy potential. The purpose of this report is to assess technical and economic viability of the site for hydroelectric and geothermal energy production. In addition, the report outlines financing options thatcould assist in the implementation of a system.
Original language | American English |
---|---|
Number of pages | 64 |
DOIs | |
State | Published - 2013 |
Bibliographical note
Produced under direction of the U.S. Environmental Protection Agency (EPA) by the National Renewable Energy Laboratory (NREL) under Interagency Agreement IAG-09-1719 and Task No WFD3.1000.NREL Publication Number
- NREL/TP-6A20-51321
Keywords
- economics
- EPA
- feasibility study
- geothermal
- heat pump
- hydroelectric
- JEDDO
- Pennsylvania