Abstract
The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Vermont Asbestos Group (VAG) Mine site in Eden, Vermont, and Lowell, Vermont, for a feasibility study of renewable energy production. The National Renewable Energy Laboratory (NREL) provided technical assistance for this project. The purpose of this report is to assess thesite for a possible photovoltaic (PV) system installation and estimate the cost, performance, and site impacts of different PV options. In addition, the report recommends financing options that could assist in the implementation of a PV system at the site.
Original language | American English |
---|---|
Number of pages | 46 |
DOIs | |
State | Published - 2013 |
NREL Publication Number
- NREL/TP-7A30-57766
Keywords
- economics
- EDEN
- EPA
- financing
- JEDI
- Lowell
- MINE
- photovoltaic
- PV
- RE-Powering America's Land Initiative
- renewable energy (RE)
- SAM
- System Advisor Model (SAM)
- VAG
- Vermont
- Vermont Asbestos Group