Abstract
The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Snohomish County Cathcart Landfill Site in Snohomish County, Washington, for a feasibility study of renewable energy production. The National Renewable Energy Laboratory (NREL) provided technical assistance for this project. The purpose of this report is to assess the sitefor a photovoltaic (PV) system installation and estimate the cost, performance, and site impacts of different PV options. In addition, the report recommends financing options that could assist in the implementation of a PV system at the site.
Original language | American English |
---|---|
Number of pages | 69 |
DOIs | |
State | Published - 2013 |
NREL Publication Number
- NREL/TP-7A40-58328
Keywords
- brownfields
- economics
- EPA
- feasibility study
- ground-mounted
- Iowa
- JEDI
- Perry
- photovoltaic
- PV
- RE-Powering America's Land Initiative
- SAM
- Snohomish County Cathcart Landfill Site
- System Advisor Model (SAM)