Abstract
The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative through the Region 6 contract, selected Ft. Hood Army Base in Killeen, Texas, for a feasibility study of renewable energy production. The National Renewable Energy Laboratory (NREL) provided technical assistance for this project. The purpose of this study is to assess the site for possiblephotovoltaic (PV) system installations and estimate the cost, performance, and site impacts of different PV options. In addition, the report recommends financing options that could assist in the implementation of a PV system at the site.
Original language | American English |
---|---|
Number of pages | 62 |
DOIs | |
State | Published - 2013 |
NREL Publication Number
- NREL/TP-6A10-60398
Keywords
- army base
- EPA
- financing
- Fort Hood
- JEDI
- Killeen
- photovoltaic
- PV
- SAM
- Texas