Abstract
The National Renewable Energy Laboratory (NREL) initiated a Prize with support from Argonne National Laboratory (ANL), Oak Ridge National Laboratory (ORNL), and Pacific Northwest National Laboratory (PNNL), and sponsored by the U.S. Department of Energy Water Power Technologies Office (DOE WPTO) to encourage ideas to reduce the time to commissioning for PSH projects. As a result, nine finalists have been chosen to develop their concepts in advance of the FAST Prize Pitch Contest to be held on October 7, 2019. The national labs will provide technical and business advisement to the noted FAST Prize finalists in preparation for this Pitch Contest.
Original language | American English |
---|---|
Number of pages | 7 |
DOIs | |
State | Published - 2021 |
NREL Publication Number
- NREL/TP-5700-79871
Keywords
- accelerating
- CRADA
- FAST Prize Pitch Contest
- infrastructure
- national scalability
- pumped storage hydropower (psh)
- sewer overflow tunnels
- water power