Abstract
This report describes the adoption and implementation of FERC Order 2003 and the reasons for the sharp rise in generation interconnection filings in recent years.
Original language | American English |
---|---|
Number of pages | 103 |
DOIs | |
State | Published - 2009 |
Bibliographical note
Work performed by Exeter Associates, Inc., Columbia, MarylandNREL Publication Number
- NREL/SR-550-44508
Keywords
- capacity
- FERC
- grid integration
- interconnection
- ISO
- power generators
- regulations
- system integration
- utilities
- wind