GeoRePORT Protocol Volume III: Technical Assessment Tool

Alex Badgett, Katherine Young, Kevin McCabe, Patrick Dobson

Research output: NRELTechnical Report

Abstract

Technical Project Readiness Level is an assessment of the development of a geothermal area as a power generation facility. Five separate progression levels ranging from 'unrecognizable' to 'demonstrated' are designated, with criteria specific to technical development that must be completed to move up the scale.
Original languageAmerican English
Number of pages97
StatePublished - 2019

NREL Publication Number

  • NREL/TP-6A20-72950

Keywords

  • GeoRePORT
  • geothermal
  • technical assessment