Abstract
In 2024, GPA met approximately 12%1 of electricity sales with renewable energy, up from 6% in 20202. GPA's 2021 Integrated Resource Plan (IRP) charts a potential path to meeting 100% renewable electricity by 2040. Since achieving 100% will require significant infrastructure investment to transition the power system to renewable electricity generation, Guam Energy Strategies is exploring technology options, locations, resource adequacy, rate impacts, and other considerations for reaching Guam's energy goals.
Original language | American English |
---|---|
Publisher | National Renewable Energy Laboratory (NREL) |
Number of pages | 2 |
State | Published - 2025 |
NREL Publication Number
- NREL/FS-7A40-93014
Keywords
- Guam
- island energy
- renewable energy