Integrated Design Team Guide to Realizing Over 75% Lighting Energy Savings in High-Performance Office Buildings (Fact Sheet)

Jennifer Scheib

Research output: NRELFact Sheet

Abstract

This checklist packet is a team-focused guide to realizing energy savings in high-performance office buildings through carefully considered lighting and control design. The checklists should be distributed among the integrated project team members, including the owner, lighting designer and engineer, commissioning agent, and facility manager, at the beginning of a project and referred toregularly during design meetings and drawing reviews. The checklists are arranged by key design considerations (daylighting, occupancy, task) and key integration points (energy goal, sequence of operations). Each action or question is related to a design stage during which failure to act could jeopardize energy savings.
Original languageAmerican English
Number of pages16
StatePublished - 2013

NREL Publication Number

  • NREL/FS-5500-51665

Keywords

  • control design
  • energy savings
  • high performance
  • lighting design
  • office building