Integrated Transmission and Distribution Co-Simulation Platform for Demonstration of Bulk Grid Services Using Distributed Energy Resources: Article No. 3215

Research output: Contribution to journalArticlepeer-review

Abstract

In September 2020, the Federal Energy Regulatory Commission (FERC) released Order 2222, which opens wholesale markets to small-capacity distributed energy resources (DERs), recognizing their potential in improving operational efficiency by providing bulk grid services. Therefore, a co-simulation capability that can connect transmission and distribution (T&D) simulations and evaluate the impacts of DER provision of bulk grid services is needed. In this paper, we present a new integrated T&D co-simulation platform that incorporates T&D system simulators, DER aggregator/group strategies, and a co-simulation coordinator. Industry-standard communication protocols are employed to mimic real-world conditions. Secondary frequency regulation is selected as the representative bulk grid service, and we simulate the responses of DERs to the frequency regulation signals. The simulation results for a solar-rich distribution feeder in Colorado, USA, demonstrate how the T&D co-simulation setup is used to evaluate the contributions of DERs to minimize the bulk grid frequency deviation.
Original languageAmerican English
Number of pages16
JournalEnergies
Volume17
Issue number13
DOIs
StatePublished - 2024

NREL Publication Number

  • NREL/JA-5D00-88086

Keywords

  • distributed energy resource
  • frequency regulation
  • grid service
  • T&D co-simulation