Integration of Intermittent Sources Into Baleriaux -- Booth Production Cost Models

George Fegan, C. Percival

    Research output: NRELTechnical Report

    Abstract

    In electric utility planning measures of the risk of failure to meet load are extremely important. These measures are used in determining the value of a new source to a system mix and in expansion planning for the system.
    Original languageAmerican English
    Number of pages8
    DOIs
    StatePublished - 1979

    NREL Publication Number

    • NREL/TP-35-375

    Fingerprint

    Dive into the research topics of 'Integration of Intermittent Sources Into Baleriaux -- Booth Production Cost Models'. Together they form a unique fingerprint.

    Cite this