Interconnection Testing of Distributed Resources

Benjamin Kroposki, Thomas Basso, Richard DeBlasio

Research output: Contribution to conferencePaperpeer-review

3 Scopus Citations

Abstract

With the publication of IEEE 1547-2003 Standard for Interconnecting Distributed Resources with Electric Power Systems, the electric power industry has a need to develop tests and procedures for verifying that interconnection equipment meets the technical requirements. A new standard IEEE P1547.1 is being written that will give detailed tests and procedures for confirming that equipment meets the interconnection requirements. The National Renewable Energy Laboratory has been validating new test procedures that are being developed as part of IEEE P1547.1. As work progresses on the validation of the procedures, information and test reports are passed on to the working group of IEEE P1547.1 for changes to future revisions.

Original languageAmerican English
Pages1892-1897
Number of pages6
StatePublished - 2004
Event2004 IEEE Power Engineering Society General Meeting - Denver, CO, United States
Duration: 6 Jun 200410 Jun 2004

Conference

Conference2004 IEEE Power Engineering Society General Meeting
Country/TerritoryUnited States
CityDenver, CO
Period6/06/0410/06/04

Bibliographical note

For preprint version see NREL/CP-560-35569

NREL Publication Number

  • NREL/CP-560-38315

Keywords

  • Dispersed storage and generation
  • Power Distribution
  • Power system testing
  • Power system transients
  • Synchronous generators
  • Test equipment
  • Test facilities

Fingerprint

Dive into the research topics of 'Interconnection Testing of Distributed Resources'. Together they form a unique fingerprint.

Cite this