Abstract
With the publication of IEEE 1547-2003 Standard for Interconnecting Distributed Resources with Electric Power Systems, the electric power industry has a need to develop tests and procedures for verifying that interconnection equipment meets the technical requirements. A new standard IEEE P1547.1 is being written that will give detailed tests and procedures for confirming that equipment meets the interconnection requirements. The National Renewable Energy Laboratory has been validating new test procedures that are being developed as part of IEEE P1547.1. As work progresses on the validation of the procedures, information and test reports are passed on to the working group of IEEE P1547.1 for changes to future revisions.
Original language | American English |
---|---|
Pages | 1892-1897 |
Number of pages | 6 |
State | Published - 2004 |
Event | 2004 IEEE Power Engineering Society General Meeting - Denver, CO, United States Duration: 6 Jun 2004 → 10 Jun 2004 |
Conference
Conference | 2004 IEEE Power Engineering Society General Meeting |
---|---|
Country/Territory | United States |
City | Denver, CO |
Period | 6/06/04 → 10/06/04 |
Bibliographical note
For preprint version see NREL/CP-560-35569NREL Publication Number
- NREL/CP-560-38315
Keywords
- Dispersed storage and generation
- Power Distribution
- Power system testing
- Power system transients
- Synchronous generators
- Test equipment
- Test facilities