Interim Test Procedures for Evaluating Electrical Performance and Grid Integration of Vehicle-to-Grid Applications

Research output: NRELTechnical Report

Abstract

The objective of this report is to provide a test plan for V2G testing. The test plan is designed to test and evaluate the vehicle's power electronics capability to provide power to the grid, and to evaluate the vehicle's ability to connect and disconnect from the utility according to a subset of the IEEE Std. 1547 tests.
Original languageAmerican English
Number of pages29
DOIs
StatePublished - 2011

NREL Publication Number

  • NREL/TP-5500-51001

Keywords

  • grid interconnection testing
  • IEEE 1547
  • IEEE 1547-1
  • PHEV
  • V2G