Increased deployment of wind and solar raises new questions for power system planners regarding the future mix of generation technologies, optimal siting of generation capacity, trade-offs between generation and transmission investments, and system flexibility needs. The National Renewable Energy Laboratory (NREL) is working with Tamil Nadu Generation and Distribution Company (TANGEDCO) to answer the following questions: How much—and what type—of generation and transmission investments are needed to serve future demand at least cost? How can variable resources such as wind and solar be considered in the planning process? What are the key drivers (e.g., policies, technology costs, fuel constraints) for investments?
Original language | American English |
---|---|
Number of pages | 2 |
State | Published - 2021 |
NREL Publication Number
- NREL/FS-5C00-79997
Keywords
- Children's Investment Fund Foundation
- India
- power system planning
- Tamil Nadu