Model Validation at the 204 MW New Mexico Wind Energy Center: Preprint

Research output: Contribution to conferencePaper

Abstract

In this paper, we describe methods to derive and validate equivalent models for a large wind farm. FPL Energy's 204-MW New Mexico Wind Energy Center, which is interconnected to the Public Service Company of New Mexico (PNM) transmission system, was used as a case study. The methods described are applicable to any large wind power plant.
Original languageAmerican English
Number of pages14
StatePublished - 2006
EventAmerican Wind Energy Association (AWEA) Windpower 2006 Conference - Pittsburgh, Pennsylvania
Duration: 4 Jun 20067 Jun 2006

Conference

ConferenceAmerican Wind Energy Association (AWEA) Windpower 2006 Conference
CityPittsburgh, Pennsylvania
Period4/06/067/06/06

NREL Publication Number

  • NREL/CP-500-39048

Keywords

  • AWEA
  • conference papers
  • large wind farm
  • model validation
  • New Mexico Wind Energy Center
  • wind
  • wind power
  • Windpower

Fingerprint

Dive into the research topics of 'Model Validation at the 204 MW New Mexico Wind Energy Center: Preprint'. Together they form a unique fingerprint.

Cite this