Motor Assembly Plant Saves $85,000 with Compressed Air System Improvements (Bodine Electric's Chicago Facility): Office of Industrial Technologies (OIT) BestPractices Technical Case Study

    Research output: NRELBrochure

    Abstract

    This case study is one in a series on industrial firms who are implementing energy efficient technologies and system improvements into their manufacturing processes. This case study documents the activities, savings, and lessons learned on the Bodine Electric motor assembly plant project.
    Original languageAmerican English
    Number of pages4
    StatePublished - 2001

    NREL Publication Number

    • NREL/BR-810-30207

    Other Report Number

    • DOE/GO-102001-1324

    Fingerprint

    Dive into the research topics of 'Motor Assembly Plant Saves $85,000 with Compressed Air System Improvements (Bodine Electric's Chicago Facility): Office of Industrial Technologies (OIT) BestPractices Technical Case Study'. Together they form a unique fingerprint.

    Cite this