Near-Term Research and Testing of the CWE-300: Executive Summary of Project Final Report, 1 September 1997 - 30 August 1999

Research output: NRELSubcontract Report

Abstract

This report is a summary of activity on this subcontract during the period from September 1, 1997 through August 30, 1999. The contract entailed the engineering, component tests, system field tests, certification, and preparation for manufacturing the existing Cannon Wind Eagle 300-kW (CWE-300) wind turbine. The CWE 300 is a lightweight, flexible machine with a number of innovative designfeatures that, relative to comparable rigid-hub machines, promises to contribute to reduced capital, installation, and maintenance costs. The architecture of the CWE-300 evolved from earlier wind turbine models developed over several decades. The current design retains many of the desirable features of earlier machines, addresses problems exhibited by those machines, and incorporates furtherinnovative design features.
Original languageAmerican English
Number of pages51
StatePublished - 2000

Bibliographical note

Work performed by Cannon Wind Eagle Corporation, Bakersfield, California

NREL Publication Number

  • NREL/SR-500-27475

Fingerprint

Dive into the research topics of 'Near-Term Research and Testing of the CWE-300: Executive Summary of Project Final Report, 1 September 1997 - 30 August 1999'. Together they form a unique fingerprint.

Cite this