Abstract
This CRADA (1) facilitates commissioning of the new NWTC 5MW dynamometer facility while testing a General Electric (Participant) 2.75MW wind turbine drivetrain under loaded conditions, (2) facilitates commissioning of the new NWTC the Controllable Grid Interface (CGI) as part of testing the GE 2.75MW drivetrain, (3) facilitates further wind turbine drivetrain testing utilizing the commissioned dynamometer and CGI test facilities.
Original language | American English |
---|---|
Number of pages | 5 |
DOIs | |
State | Published - 2018 |