Abstract
Data center demand growth in Virginia will need to met with many options - GETs and/or reconductoring have the potential to be part of the solution suite in the short-term and medium-term. Almost all GETs and reconductoring technologies have more favorable economics than transmission wires investments considering relatively low levels of existing wide-scale deployment. Deployment of GETs and/or reconductoring is not a one size fits all - requires detailed analysis. The complementary nature of GETs and/or reconductoring impacts have the potential to be synergistic (more congestion relief, more transfer capability, more cost savings - when implemented together).
Original language | American English |
---|---|
Number of pages | 39 |
DOIs | |
State | Published - 2024 |
NREL Publication Number
- NREL/PR-6A40-90734
Keywords
- advanced power flow controls
- APFCs
- DLRs
- dynamic line ratings
- GETs
- reconductoring
- transmission topology optimization
- TTO