Photovoltaic Manufacturing Technology Program, Final Subcontract Report, 9 January 1991 - 14 April 1991

    Research output: NRELSubcontract Report

    Abstract

    The work performed in this contract was focused on two areas: an economic analysis of present manufacturing methods and the conceptualization of advanced equipment. The economic analysis was built on our experience with tabbing and connecting thick cells. This experience was used to generate the cost analysis that clearly points to the improvements in yield and throughput to make PV manufacturingmore cost effective. 3 refs.
    Original languageAmerican English
    Number of pages37
    StatePublished - 1991

    Bibliographical note

    Work performed by Spire Corporation, Bedford, Massachusetts

    NREL Publication Number

    • NREL/SR-214-4476

    Fingerprint

    Dive into the research topics of 'Photovoltaic Manufacturing Technology Program, Final Subcontract Report, 9 January 1991 - 14 April 1991'. Together they form a unique fingerprint.