Abstract
The Phase 1 portion of the Photovoltaic Manufacturing Technology (PVMaT) Project, the problem identification phase, was completed in mid-1991. This work involved competitive bidding that was open to any U.S. firm with existing manufacturing capabilities, regardless of material or module design. In early 1991, subcontracts were awarded to 22 of approximately 40 bidders. Each subcontract was fundedat a level of up to $50,000 and a duration of three months.
Original language | American English |
---|---|
Number of pages | 11 |
DOIs | |
State | Published - 1992 |
NREL Publication Number
- NREL/MK-411-4973
Keywords
- photovoltaic manufacturing technology (PVMAT)
- project
- PVMAT