Prefeasibility Assessment for Solar PV and Storage for Critical Community Facilities in Chernihiv, Ukraine

Research output: NRELTechnical Report

Abstract

A prefeasibility analysis is performed for integrating solar photovoltaics and battery energy storage at four critical facilities in Chernihiv, Ukraine. The facilities were identified by Chernihiv city officials and include Hospital No. 2, the Maternity Hospital, Secondary School No. 11, and Preschool No. 4. The analyses were performed using NREL's REopt decision-support software tool. The analysis identifies potential capacities for PV and battery energy storage to provide both economic and resilience benefits. The conceptual architecture and estimates of key summary financial and performance metrics are presented.
Original languageAmerican English
Number of pages42
DOIs
StatePublished - 2024

NREL Publication Number

  • NREL/TP-7A40-91296

Keywords

  • battery
  • BESS
  • Chernihiv
  • critical facilities
  • international
  • photovoltaics
  • PV
  • technoeconomic analysis
  • U.S. Agency for International Development
  • Ukraine
  • USAID
  • USAID-NREL Partnership

Fingerprint

Dive into the research topics of 'Prefeasibility Assessment for Solar PV and Storage for Critical Community Facilities in Chernihiv, Ukraine'. Together they form a unique fingerprint.

Cite this