Abstract
This paper describes the wind-diesel hybrid power project, a technology demonstration project conducted by the National Renewable Energy Laboratory, Kotzebue Electric Association, the Alaska Village Electric Cooperative and the Alaska Energy Authority in Wales, Alaska. It discusses each of the relevant plant design considerations in detail, in hopes that system integrators and project plannersthat read the report will realize the importance of giving proper attention to diesel plant preparation (or replacement), and future wind-diesel systems will be installed and commissioned more quickly and cost effectively.
Original language | American English |
---|---|
Number of pages | 13 |
State | Published - 2001 |
Event | AWEA WindPower 2001 Conference - Washington, D.C. Duration: 4 Jun 2001 → 7 Jun 2001 |
Conference
Conference | AWEA WindPower 2001 Conference |
---|---|
City | Washington, D.C. |
Period | 4/06/01 → 7/06/01 |
NREL Publication Number
- NREL/CP-500-30586