Abstract
This issue brief provides an overview of key technical requirements for inverter-based resources - including distributed energy resources (DERs) - to support the reliable and safe operation of the Providencia Island electrical grid, and other island or isolated area mini-grid applications. With the planned increase in inverter-based resources and the introduction of energy storage, adopting Institute of Electrical and Electronics Engineers (IEEE) Std 1547-2018, including the more advanced performance capabilities for voltage and frequency ride-through, will simplify interconnection as well as help to maintain a safe, reliable grid on Providencia Island.
Original language | American English |
---|---|
Number of pages | 24 |
DOIs | |
State | Published - 2022 |
NREL Publication Number
- NREL/TP-5D00-83562
Keywords
- Colombia
- Hurricane Lota
- interconnection
- Providencia Island
- Scaling Up Renewable Energy (SURE)
- technical requirements
- USAID
- USEA