Abstract
Power system operators schedule additional capacity above or below the amount required to meet the expected demand at any time interval to ensure reliable operation. This excess capacity is known as operating reserve. This paper presents the results of simulating an additional operating reserve product, referred to as 'flexibility reserve,' on the IEEE 118-bus test system.
Original language | American English |
---|---|
Number of pages | 10 |
State | Published - 2015 |
Event | IEEE 2015 Annual Green Technology Conference - New Orleans, Louisiana Duration: 15 Apr 2015 → 17 Apr 2015 |
Conference
Conference | IEEE 2015 Annual Green Technology Conference |
---|---|
City | New Orleans, Louisiana |
Period | 15/04/15 → 17/04/15 |
NREL Publication Number
- NREL/CP-5D00-63402
Keywords
- flexibility reserve
- IEEE 118-bus test system
- operating reserves
- reliability