Abstract
This Office of Industrial Technologies Technical Case Study reveals how Bethlehem Steel Corporation was able to save energy, reduce operational costs, and decrease system maintenance by installing a variable-frequency drive and making associated equipment modifications.
Original language | American English |
---|---|
Number of pages | 4 |
State | Published - 1999 |
NREL Publication Number
- NREL/FS-330-25997
Other Report Number
- DOE/GO-10099-710