Abstract

Battery energy storage systems (BESSs) are an important asset for power systems with high integration levels of renewable energy, and they can be controlled to provide various critical services to the power grid. This paper presents the real-world experience of using a megawatt-scale BESS with grid-following (GFL) and grid-forming (GFM) controls and a run-of-river (ROR) hydropower plant to restore a regional power system. To demonstrate this, we carry out power-hardware-in-the-loop experiments integrating an actual GFL- or GFM-controlled BESS and a load bank. Both the simulation and experimental results presented in this paper show the different roles of GFL- or GFM-controlled BESS in power system black starts. The results provide further insight for system operators on how GFL- or GFM-controlled BESS can enhance grid stability and how an ROR hydropower plant can be converted into a black-start-capable unit with the support of a small-capacity BESS. The results shows that an ROR hydropower plant combined with a BESS has the potential of becoming one of enabling elements to perform bottom-up black-start schemes as opposed to conventional bottom-down method, thus enhancing the system resiliency and robustness.
Original languageAmerican English
JournalJournal of Modern Power Systems and Clean Energy
DOIs
StatePublished - 2024

NREL Publication Number

  • NREL/JA-5D00-87600

Keywords

  • battery energy storage system
  • black start
  • grid-following control
  • grid-forming control
  • run-of-river hydropower

Fingerprint

Dive into the research topics of 'Regional Power System Black Start with Run of River Hydropower Plant and Battery Energy Storage'. Together they form a unique fingerprint.