Renewable Energy Opportunity Assessment

    Research output: NRELSubcontract Report

    Abstract

    Presently, the US EPA is constructing a new complex at Research Triangle Park, North Carolina to consolidate its research operations in the Raleigh-Durham area. The National Computer Center (NCC) is currently in the design process and is planned for construction as partof this complex. Implementation of the new technologies can be planned as part of the normal construction process, and fullcredit for elimination of the conventional technologies can be taken. Several renewable technologies are specified in the current plans for the buildings. The objective of this study is to identify measures that are likely to be both technically and economically feasible.
    Original languageAmerican English
    PublisherNational Renewable Energy Laboratory (NREL)
    Number of pages20
    StatePublished - 1998

    Bibliographical note

    This study funded by the U.S.EPA Facilities Management and Services Division.

    NREL Publication Number

    • NREL/SR-560-29918

    Keywords

    • commercial buildings
    • construction
    • renewable energy (RE)
    • renewable technologies

    Fingerprint

    Dive into the research topics of 'Renewable Energy Opportunity Assessment'. Together they form a unique fingerprint.

    Cite this