    Abstract

    This final report covers progress made on subcontract NAT-7-77015-07 by PrimeStar Solar Inc. for the 18 month period from September 27, 2007 through March 26, 2009. The project objectives were to accelerate the commercialization of the world record 16.5% efficiency cadmium telluride photovoltaic technology. This was done by developing high performance 6'x6' prototype mini-modules and by designingand commissioning a pilot line for manufacturing of commercial sized 60cmx120cm modules. This subcontract aligns with the SAI program by accelerating the development of high efficiency low cost CdTe solar PV module manufacturing. This will contribute to the goal of PV grid parity by 2015. Progress with the deliverables and milestones in this subcontract constitutes progress towards the KPP andmilestone objectives for the SAI program.
    Original languageAmerican English
    Number of pages15
    StatePublished - 2011

    Bibliographical note

    Work performed by PrimeStar Solar, Arvada, Colorado

    NREL Publication Number

    • NREL/SR-5200-51518

    Keywords

    • CdTe
    • PV
    • SAI
    • solar cells

    Fingerprint

    Dive into the research topics of 'Scale-Up of World Record 16.5% CdTe Cell Design for a 50 MWp Production Facility: September 27, 2007 - March 26, 2009'. Together they form a unique fingerprint.

    Cite this