Abstract
This report discusses research efforts from the first year of a project analyzing the impacts of high penetration levels of photovoltaic (PV) resources interconnected onto Southern California Edison's (SCE's) distribution system. SCE will be interconnecting a total of 500 MW of commercial scale PV within their service territory by 2015. This Year 1 report describes the need for investigatinghigh-penetration PV scenarios on the SCE distribution system; discusses the necessary PV system modeling and distribution system simulation advances; describes the available distribution circuit data for the two distribution circuits identified in the study; and discusses the additional inverter functionality that could be implemented in order to specifically mitigate some of the undesirabledistribution system impacts caused by high-penetration PV installations.
Original language | American English |
---|---|
Number of pages | 88 |
DOIs | |
State | Published - 2011 |
NREL Publication Number
- NREL/TP-5500-50875
Keywords
- distribution systems
- high penetration
- high-penetration
- inverters
- photovoltaics (PV)
- PV
- SCE