Arizona Public Service (APS) is currently installing new power facilities to generate a portion of its electricity from solar resources that will satisfy its obligation under the Arizona Environmental Portfolio Standard (EPS). During FY04, APS began construction on a 1-MWe parabolic trough concentrating solar power plant. This plant represents the first parabolic trough plant to beginconstruction since 1991. Site preparation and construction activities continued throughout much of FY05, and startup activities are planned for Fall 2005 (with completion early in FY06). The plant will be the first commercial deployment of the Solargenix parabolic trough collector technology developed under contract to the National Renewable Energy Laboratory. The plant will use an organicRankine cycle (ORC) power plant, provided by Ormat. The ORC power plant is much simpler than the conventional steam Rankine cycle plant and allows unattended operation of the facility.
Original languageAmerican English
Number of pages5
StatePublished - 2005
Event2005 DOE Solar Energy Technologies Program Review Meeting - Denver, Colorado
Duration: 7 Nov 200510 Nov 2005

Conference

Conference2005 DOE Solar Energy Technologies Program Review Meeting
CityDenver, Colorado
Period7/11/0510/11/05

Bibliographical note

Presented at the 2005 DOE Solar Energy Technologies Program Review Meeting held November 7-10, 2005 in Denver, Colorado. Also included in the proceedings available on CD-ROM (DOE/GO-102006-2245; NREL/CD-520-38557)

NREL Publication Number

  • NREL/CP-550-39205

Keywords

  • NREL
  • parabolic trough
  • photovoltaics (PV)
  • PV
  • solar

Fingerprint

Dive into the research topics of 'Status of APS 1-Mwe Parabolic Trough Project'. Together they form a unique fingerprint.

Cite this