Abstract
This document is intended to aid in the understanding and application of the New York State Standardized Interconnection Requirements (SIR) and Application Process for New Distributed Generators 5 MW or Less Connected in Parallel with Utility Distribution Systems, and it aims to provide supplemental information and discussion on selected topics relevant to the SIR. This guide focuses on technical issues that have to date resulted in the majority of utility findings within the context of interconnecting photovoltaic (PV) inverters. This guide provides background on the overall issue and related mitigation measures for selected topics, including substation backfeeding, anti-islanding and considerations for monitoring and controlling distributed energy resources (DER).
Original language | American English |
---|---|
Number of pages | 45 |
DOIs | |
State | Published - 2017 |
NREL Publication Number
- NREL/TP-5D00-70183
Keywords
- DER
- distributed energy resources
- interconnection
- New York
- New York State Standardized Interconnection Requirements
- NYSERDA
- SIR