Abstract
Portland General Electric (PGE) is installing a 5-megawatt (MW) lithium-ion-based battery-inverter system (BIS) in Salem, Oregon, as part of the Pacific Northwest Smart Grid Demonstration Project. NREL will assist PGE in testing a 250-kilovolt-ampere (kVA) portion of the BIS in order to verify correct operation and minimize risk to subsequent demonstrations. In this project NREL will providetechnical support for the 250-kVA test and will work with PGE to write a test plan and evaluate the system in the lab before deployment in the field.
Original language | American English |
---|---|
Number of pages | 4 |
DOIs | |
State | Published - 2013 |
NREL Publication Number
- NREL/TP-7A10-58889
Keywords
- battery
- CRADAS
- faults
- inverter
- lithium ion-based battery-inverter system
- microgrid
- Pacific Northwest Smart Grid
- smart grid demonstration project