TY - GEN
T1 - The Demand for a Domestic Offshore Wind Energy Supply Chain
AU - Shields, Matt
AU - Marsh, Ruth
AU - Stefek, Jeremy
AU - Oteri, Frank
AU - Gould, Ross
AU - Rouxel, Noe
AU - Diaz, Katherine
AU - Molinero, Javier
AU - Moser, Abigayle
AU - Malvik, Courtney
AU - Tirone, Sam
PY - 2022
Y1 - 2022
N2 - In March of 2021, the Biden-Harris Administration established a National Offshore Wind Target to install 30 GW by 2030. This ambitious goal was not only intended to help reduce dependencies on fossil fuels, but also represents an opportunity to establish a new and sustainable industry in the United States. The announcement referenced the potential benefits of establishing a domestic supply chain, including the opportunity for existing suppliers to produce thousands of components while creating tens of thousands of jobs over the course of the decade. This vision by the Biden-Harris Administration aligns with the perspective of the offshore wind industry. At a Leadership 100 event hosted by the Business Network for Offshore wind in 2019, offshore wind developers and manufacturers identified the need for a roadmap outlining a pathway to a domestic supply chain as the top priority facing the industry. Building up domestic manufacturing capabilities will not only energize local industries but can potentially de-risk individual project by reducing reliance on importing resources from European or Asian markets. Although establishing a domestic supply chain will require significant investment, it has the potential to create substantial benefits throughout the industry and, by extension, on the decarbonization goals of the United States. This study characterizes the challenges and opportunities facing the growth of a domestic supply chain industry and evaluates the potential benefits that could be achieved through the creation of the supply chain. This report is the first of a two-part series which will describe the full supply chain roadmap and the associated benefits; the current report focuses on the high-level deployment, workforce, and component requirements that need to be met to achieve the National Offshore Wind Target. We will present: 1. A deployment pipeline that demonstrates the pathway to 30 GW, the associated demand for major fixed-bottom and floating offshore wind components (turbines, foundations, cables, substations), and the vessel and port requirements to support these installation activities. 2. A series of sensitivity analyses showing how the demand for components, ports, and vessels changes for different technology pathways and availability of the global supply chain. 3. An estimate of the total number of jobs that would be required to support these deployment scenarios under varying levels of assumed domestic content. 4. A comprehensive list of the Tier 1, 2, and 3 components (finished components, subassemblies, and subcomponents) required to construct fixed-bottom and floating offshore wind projects. 5. A discussion of critical path components that represent a significant challenge, bottleneck, or risk for a future domestic supply chain.
AB - In March of 2021, the Biden-Harris Administration established a National Offshore Wind Target to install 30 GW by 2030. This ambitious goal was not only intended to help reduce dependencies on fossil fuels, but also represents an opportunity to establish a new and sustainable industry in the United States. The announcement referenced the potential benefits of establishing a domestic supply chain, including the opportunity for existing suppliers to produce thousands of components while creating tens of thousands of jobs over the course of the decade. This vision by the Biden-Harris Administration aligns with the perspective of the offshore wind industry. At a Leadership 100 event hosted by the Business Network for Offshore wind in 2019, offshore wind developers and manufacturers identified the need for a roadmap outlining a pathway to a domestic supply chain as the top priority facing the industry. Building up domestic manufacturing capabilities will not only energize local industries but can potentially de-risk individual project by reducing reliance on importing resources from European or Asian markets. Although establishing a domestic supply chain will require significant investment, it has the potential to create substantial benefits throughout the industry and, by extension, on the decarbonization goals of the United States. This study characterizes the challenges and opportunities facing the growth of a domestic supply chain industry and evaluates the potential benefits that could be achieved through the creation of the supply chain. This report is the first of a two-part series which will describe the full supply chain roadmap and the associated benefits; the current report focuses on the high-level deployment, workforce, and component requirements that need to be met to achieve the National Offshore Wind Target. We will present: 1. A deployment pipeline that demonstrates the pathway to 30 GW, the associated demand for major fixed-bottom and floating offshore wind components (turbines, foundations, cables, substations), and the vessel and port requirements to support these installation activities. 2. A series of sensitivity analyses showing how the demand for components, ports, and vessels changes for different technology pathways and availability of the global supply chain. 3. An estimate of the total number of jobs that would be required to support these deployment scenarios under varying levels of assumed domestic content. 4. A comprehensive list of the Tier 1, 2, and 3 components (finished components, subassemblies, and subcomponents) required to construct fixed-bottom and floating offshore wind projects. 5. A discussion of critical path components that represent a significant challenge, bottleneck, or risk for a future domestic supply chain.
KW - manufacturing
KW - offshore wind
KW - supply chain
KW - workforce
U2 - 10.2172/1860239
DO - 10.2172/1860239
M3 - Technical Report
ER -