Transmission Constraint Screening for Production Cost Modeling at Scale

Research output: NRELPresentation

Abstract

Transmission constraint calculation and screening, for both unit commitment and economic dispatch, is a critical feature of a performant solution method, but one that is often overlooked in the literature. In this talk, we will discuss the transmission constraint calculation and screening algorithm implemented in the open-source Egret package for electrical grid optimization and compare it against the more straightforward approach Egret originally implemented. Finally, we discuss the implications for transmission constraint sharing within a production cost modeling simulation.
Original languageAmerican English
Number of pages23
StatePublished - 2022

Publication series

NamePresented at the 2022 INFORMS Annual Meeting, 16-19 October 2022, Indianapolis, Indiana

NREL Publication Number

  • NREL/PR-2C00-84287

Keywords

  • DCOPF
  • production cost modeling
  • transmission constraint screening
  • unit commitment

Fingerprint

Dive into the research topics of 'Transmission Constraint Screening for Production Cost Modeling at Scale'. Together they form a unique fingerprint.

Cite this